INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

How to determine if a project requires configuration managemnt

How to determine if a project requires configuration managemnt

How to determine if a project requires configuration managemnt

(OP)
In my business every project is a one of a kind system with a unique configuration of electro-mechanical hardware and custom software. Most projects are small that cost under $100K and last less than 3 months. We do apply traditional project management techniques to our projects, but struggle with configuration management.
Specifically knowing when configuration management applies and when it does not.

Thanks in advance for feedback !

RE: How to determine if a project requires configuration managemnt

Configuration management should always apply, otherwise you have no config management for anything, generally speaking.

Configuration management is a system and process that can best be summed up as "A change in form, fit, or function of a part requires a new definition of the part, not just a revision.  Configurations are not controlled by revision."

Another way to put it for commercial products is that if you sell a system to a customer, then you can not make a change to the definition of that system or when the customer has a problem, you will not have a record as to what EXACTLY they have.  That doesn't mean you can make improvements on the system; you just have to redefine it somehow.  The easiest way for machined components is to add a dash number to each part.

For example, drawing 12345 would depict part 12345-1.  You can revise 12345-1 so long as you do not affect form, fit, or function.  Once you do, you then revise drawing 12345 by adding a 12345-3 configuration (even numbers are reserved for opposite hand).  Personally, since adding configuration 12345-3 also affects all upper level assemblies containing 12345-1 -- they now must also show 12345-3 by adding new dash numbers to each assembly -- I prefer to just use a different base number.

Back in manual days, part numbers were sacred.  Now they are cheap.

--Scott

For some pleasure reading, try FAQ731-376

RE: How to determine if a project requires configuration managemnt

CM = Any change to the product, what you started with on day one should be covered, how wide you take that is how much control you have over the project. However some companies decide to introduce formal change at a certian date / baseline.
People should not forget that ALL the documentation should come under CM, as this should change THEN the product!
You don't need a CM engineer if the project is small and on a limited buget (aren't they all) but someone should take on the role

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources