INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Wall Tie

Wall Tie

Wall Tie

(OP)
I am currently designing a 40-feet high single story warehouse type concrete building (Seismic Zone 4).  The roof system is open web joist and metal deck (no concrete).  I am designing the wall anchorage to the diaphragm at the roof level for the walls running parallel to the open web joist.  What details are typically used and analyzed?

RE: Wall Tie

This is probably a tilt up building which usually has embed plates with headed studs in the panels which are  used to weld to the continuous diaphragm ledger angle. This allows the shear transfer parallel to the wall.

Some engineers also put in extra steel members in the plane of the diaphragm at this area to make sure the roof panels won't crush from the force coming in perpendicular to the wall.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources