INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Replacement of Asbestos Cement pipe - options/risks
2

Replacement of Asbestos Cement pipe - options/risks

Replacement of Asbestos Cement pipe - options/risks

(OP)
Like most water utilities, we have some asbestos cement (AC) pipe in our distribution system, mostly in the 4"-10" range.  We are looking to replace some in the near future and are looking at construction methods, risks, and responsibilites.  We are lookinig at possibly totally abandoning the old ac main and replacing with new pipe.  We are also looking at main bursting with a larger diameter pipe which will leave fragments of the ac pipe in place.  The last alternate and most expensive is total removal and proper discarding of the ac pipe.  There are risks associated with each alternate, as well as different costs.  Does anyone have any information that you can provide regarding recommened replacement methods or responsible construction methods, etc.?  Any information will be greatly appreciated.

RE: Replacement of Asbestos Cement pipe - options/risks

http://www.deq.state.or.us/aq/asbestos/ASBPIPE.pdf
http://www.ci.mesa.az.us/engineering/pdf/PS3_Removal_and_Disposal_of_ACP.pdf

 You probably know all of this , but if you cut the AC pipe more health and safety rules kick in than if you pull it apart at each joint with a backhoe and a chain or sling.

 Theoretically, once it's friable ( cut/broken ) you can't abandon it underground, and transporting/disposal is more technically and legally problematic if it's cut/broken than if it's not cut .

 You can run a cable inside the pipe from one excavation to another ( fifty feet apart)in the right (loose or wet) soil conditions and pull it out in whole , unbroken pieces and simultaneously pull in new PVC behind with a trackhoe.

 If you have enough depth of bury, you can dig a ditch to one foot or so  above the old  AC main, lay a new main on top , and extend every service line a couple feet from the ditch banks and saddle them onto the new main, abandoning the old one without touching it.

RE: Replacement of Asbestos Cement pipe - options/risks

We abandon it in place where we can.  Usually constructing the new main adjacent to the old one and then tying over the service lines once the new main is pressure tested and activated.

As was stated earlier, it;s not a problem until it becomes friable, so by abandonming it in place, you avoid that issue.

In fact, there's no real reason to replace the AC pipe if it's performing ok.

Good Luck.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources