Method for Tracking and Auditing Time Studies
Method for Tracking and Auditing Time Studies
(OP)
I am interested in methods for tracking and auditing time studies. There are thousands of time studies here, which after some time need to be audited for accuracy. I would like to know how some of you track and audit your time studies. And what triggers the audit? Is it based on a predetermined schedule? Thanks for any help.





RE: Method for Tracking and Auditing Time Studies
Regards,
RE: Method for Tracking and Auditing Time Studies
PSE, thanks for your response. So, are you visually reviewing all of the standards annually for variances and the ones that you find you audit? Is that correct? Also, do you all use a software package to maintain and track your standards? We are a fabrication and assembly plant, so there are thousands of standards and line balances for different operations. What methods are you using for your standards, stopwatch, MOST, etc? Again, thanks for your help.
RE: Method for Tracking and Auditing Time Studies
Another would purposely slow down the operations to add time. A tray of loosely assembled parts were examined minutely before staking them together in assy.
The key is to do it out of view of the operator.
RE: Method for Tracking and Auditing Time Studies
Many companies use absorption cost accounting. Basically, standard overhead (absorption) cost is a product of standard labor cost (which is a product of standard time and the average hourly labor) and an average overhead factor typically between 250% -600% for most manufacturers in the US(usually on a facility, Dept., or business unit level).
So, if you have inflated labor standards you may very well have inflated standard overhead costs. When actual costs are compared to this you get a variance. Large descrepancies in overhead variance are typically due to antiquated standards. If the current variances are favorable (you can absorb more than you actually spend)....be careful as you asend this slippery slope. This may have huge perception implications on the performance of business unit as well as upper management.
RE: Method for Tracking and Auditing Time Studies
RE: Method for Tracking and Auditing Time Studies
Regards,
RE: Method for Tracking and Auditing Time Studies
We have three possible triggers for standard review: production request/grievence, part or process change or variance notice. This allows nearly anyone who has a stake in the costing to make themselves heard.
We adopted the standard that the variance needed to be greater than 10% before undertaking a time study.
We keep our data in a spreadsheet by date, operation, product and various other factors that we feel impact the results. Once a year, or as larger blocks of data are added, we run a modeling program on this data that allows us to develop labor costs for proposed products and to model results of proposed changes.
Plasgear's comments about operator shinanigans during time studies are addressed by pace rating, by notation in the time study form, by involving the supervisor and by formal discipline if required.
We keep hard copies as well as e-files.
Griffy
RE: Method for Tracking and Auditing Time Studies
That is very similar to what we do here. We have about 4 different systems for maintaining the standards, which include the e-files, spreadsheets, etc. I want to find something that would integrate all of those. Have you heard of EaseWorks? It is suppose to accomplish this. Do you all have a hard copy of all of your standards? This presents another problem because some are quite old and I have been unable to locate the hard copies to back up the standards. I am basically having to recreate a system for developing, maintaining, and auditing standards.
RE: Method for Tracking and Auditing Time Studies
One thing about "starting over" is you will be able to set the information up in ways that will be of greater use. Good Luck.
RE: Method for Tracking and Auditing Time Studies
RE: Method for Tracking and Auditing Time Studies
The first thing you may wish to do is look at what you must have. In our case, we needed three things: 1) data to support our MRP system; 2) a record of method for setting the standard; and, 3) a record of results.
The first we needed to conduct business. The second was to c.y.a. in case our methods were challenged. The third was to allow the development of a forecasting model to be used by engineering and marketing (How often can you please BOTH of these areas?). The first two being corporate required residence where many could access them while the third, being departmental, needed only to reside where those in our department could get at it.
Old data obtained using good methods is still good as long as there is decent information on the details under which it was obtained. Consequently, if no one knows who, when, why, or how, you probably want to replace these first because they are indefensible.
On the other hand, even poor results to which you have the answers to those questions has more value.
I suggest you get a copy of Maynard's IE handbook if you don't already have one. There is a lot of info on various facets of your problem.
One last item. You might want to enlist someone familiar with developing relational databases. While they may not know much about doing your job, they should know the questions to ask of a software provider to help you get what you pay for.
Okay, off soapbox.
Griffy
RE: Method for Tracking and Auditing Time Studies
Thanks so much for your help. Of course I have Maynard's IE handbook. I don't see how any IE could live without it. It has some very valuable information in there of which I definitely use. I will get help with the software to be sure it does what I expect. So, it seems like I am headed in the right direction. Again, thanks.
RE: Method for Tracking and Auditing Time Studies
Before you start auditing your standards gather information about the operations by work station and annual usages of the parts either past usage or forecasted usage. Determine the importance of the different time standards by work station. Classify by annual hours and do the highest annual hours first. I believe you will find the old 80%-20% rule applies. Many of your standards probably never need auditing.
Work on things which have the largest financial impact. The problem areas will be ones where there are many parts and many different parts made such as a saw operation or CNC laser/plasma/punch operation. Group operations are another problem area such as paint lines.
Bill