INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Step down transformer

Step down transformer

Step down transformer

(OP)
I have a oil cooled 3 phase 480vac to 380vac and neutral step down transformer rated at 20KVA roughly 40 amps per phase to neutral. What are USA standards in Tulsa concerning the protection needed and wiring of such a system. My machine that i am supplying has an Isolator rated 40amps and i have 3 fuses rated 40 amps but i need to tell the customer what he will need to do from his side. I.E. What line protection to the Transformer and also if there must be some sort of protection on the load side before it comes into my machine ? or if the transformer is within a certain distance whether there is no need for protection? Also what about the earthing and neutral aspects as the transformer will be a delta - star configuration.

Gary de Wet
Allwerx

RE: Step down transformer

There are many factors to consider. The basic rule is the primary overcurrent proteciton must be less than 125% of rated primary current unless there is secondary overcurrent protection sized at less than 125% of rated secondary current. In the latter case the primary overcurrent protection may be increased to 250%.

I would strongly suggest you hire a local consulting engineer to help with this. It shouldn't cost very much and would be well worthwhile to make sure the inspector is happy and the installation is safe.

RE: Step down transformer

unless you are willing to take responsibility of something you are not providing, i.e. system protection, i would instead tell the customer how to best protect the equipment you are providing (the transformer).

you know your equipment and the customer knows his electrical system, each should provide guidance for the other but not the other way around as it sounds from your original post.

what requirements were contained in the PO?

just my thoughts.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources