INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Existing Precast Building

Existing Precast Building

Existing Precast Building

(OP)
I am reviewing an existing building with precast double tees, ledger beams and columns. The superimposed design load is specified as 90 psf including a 3" concrete  topping. That leaves slightly over 50 psf available for LL which matches the code required LL. Even though there is block partitions on the 2nd floor, there is no load requirement for block partitions in the specified design load. There are also block partitions on the ground floor. The block partitions are generally built up tight to the structure.

Was there ever a design philosophy years ago that allowed the block partition weight on the 2nd floor to be carried by the block partitions on the first floor, if it was built tight to the structure? If yes, won't that be a big problem if a building like that is remodeled and walls on the 1st floor are removed by an unsuspecting Owner or Architect?

RE: Existing Precast Building

In reviewing lots of older plans, learning at the feet of engineers who started their careers in 1927, 1944, 1947, 1963 and 1974, I don't ever recall seeing partitions used below a floor to support partitions above a floor if they weren't already the primary structural system....just not done.

RE: Existing Precast Building

I agree with JAE, you can never count on the partitions on the lower floor to remain in the long term to support anything above, and besides, its often unlikely that the lower partitions would be of the same layout as the upper ones.

RE: Existing Precast Building

(OP)
I thank both JAE and KarlT for their comments. I am in agreement with both of you but was shocked to find an existing building where an engineer apparently used the CMU partitions below for support.

I was just wondering if this practice was common.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources