INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Strom Drain
3

Strom Drain

Strom Drain

(OP)
I just reviewed a three pipe storm drain Hydraulic Grade Line calculation. How can the peak flow from the combined
flows of the two inlets be routed through a detention basin  and through a final outlet pipe.
 A SKETCH IS SHOWN BELOW -

                          outlet pipe from detention basin
                         x

           detention basin  here   x


                inflow from storm drain to detention basin   here  x
                  cfs is known from rational equation calculations

RE: Strom Drain

you need to route the inflow hydrograph through the basin using a stage - storage - outflow relationship to get the outflow from the basin.  This can be done with various programs including HEC-1 and others.  However, by using the rational method, you do not have a hydrograph.  you need to calculate your runoff with a rainfall - runoff model which produces a hydrograph, not by using the rational method.

RE: Strom Drain

(OP)
Three different parking lots were analyzed using the Rational Equation to produce peaks. Each parking lot peak flow was used to size the three connected storm drains. The final storm drain pipe includes the three flows  and the composite flow finally reaches the retention basin. Since no routing wsa used to simulate peak flow attenuation, a conservative (large)peak flow reaches the retention basin.
Thus, using HEC-1 to simulate the peak may be a approach to the start of reservoir routing, given a stage storage relation. Is this realistic?

RE: Strom Drain

check out the responses to the most recently updated thread in the storm/flood engineering forum.  The recommended methods for pipe sizing and detention/retention modeling are discussed there.

RE: Strom Drain

In addition to CVG and SAM74's response, here is another opinion.  

If detention is required, then the applicable stormwater regulations should specify the acceptable routing methods, and the engineer should have followed them.

If detention is required by code, but no computation standards for how to size the pond are provided, then what criteria are you using to review the engineers calculations?  

It seems inappropriate to determine the criteria for the engineering analyses after receiving the submittal instead of providing clear criteria/direction before-hand.  It should be somewhat cut and dry whether the engineering analysis fulfilled the stormwater code requirements for the methods or not.  If the engineer is trying to use some un-standard method then go ahead and ask them to resubmit.  If you are in over-your-head maybe your state DOT can be of assistance, in most areas DOT have there own stormwater criteria to prevent flooding and control downstream risks.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources