INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

seismic design

seismic design

seismic design

(OP)
shall shoring of formwork be designed for seismic loads?

RE: seismic design

If you are the one charged with the shoring operation yes, I think. I am not familiar with the US codes, just read some of them 3 or 4 years ago.

But if you have one important work, say a bridge, on shoring, it would be only rational to try to ensure the survival of the investment.

One thing to consider is that the likelihood of have one strong EQ of any assumed intensity is far less for the 2 years period of construction and far less for one always ongoing 21 days shoring or so. This could be accounted from first science of construction principles, and surely would be very deffendable in Spain from codes even. It is also customary to reduce safety factors for on construction loads.

Furthermore is worth of consideration the study of alternative ways of construction that nullify the need of proceeding with much difficulty on this regard. For example for completely shored decks the piles would be standing and if the formwork was stiff enough in the "plane", shoring itself would be leaning columns on piles and abutments...but the problem in the deck would stand. Even for 6 hours some minimum cut off to the reduction in the intensity of the EQ would mean necessary changes for the horizontal formwork, since a deck is quite massive.

That this is the case with important structures is quite clear; no authority nor the ppl would approve negligence causing, say, a climbing crane falling on a seismic event while in construction, if the in construction building has not tumbled. Yet in any case we still see failures on shoring itself (I think there has been a important one -bridge- this year) without EQ. That a 15 m segment is ruined makes the local news but if a 100 m span rounds the world.  

And the thing is simply, if it is additional work, it must be paid. Just in case someone thinks one must overextend to infinity in exhaustion. Something it seems happen with legislative profligacy on everything and as well on technical warrants and checklists. You want something as good and safe and warranted as, you pay it.

RE: seismic design

It's certainly unlikely that you will have to design temporary works like shoring/scaffolding for EQ. In fact,even for wind/flood loads,we only take about a 5 year return period for design. So unless you are in Japan or on a volcanic island,your EQ magnitude for such a return period will be negligible

RE: seismic design

abhio, technically what you say is true, the thing that it is usual to establish a inferior limit to the intensity of EQ yo must use for analysis...so all is a matter of carefully reading the relevant code.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources