INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PDMWorks Lifecycle Support & Routing Approval

PDMWorks Lifecycle Support & Routing Approval

PDMWorks Lifecycle Support & Routing Approval

(OP)
I know that PDMWorks now has various lifecycles and triggers and would like to know if anyone is using these features in the following fashion:

During concept stages of design process, user is allowed to check-in/out of PDMWorks. Call this preliminary status.

The design is ready for design review. Next status to be production. Various departments need to be involved in the approval of the design, and the model may change may change a couple more times during review. The can be used at this stage to notify those who need to approve.

Design is now in production stages and a change needs to occur. Is there any way to use the triggers to notify those who need to approve the change before the model is checked into the vault?

We don't want any unauthorized changes done to models without the proper redline and approval process is completed. At the same time, we don't want to restrict access to the degree that is implied in the help menu for promoting lifecycle stage.

The approval process would also vary depending on the type of change, so the triggers wouldn't always need to notify the same people.

Anyone out there know if this has been done or if this can be done in PDMWorks?  Any input is greatly appreciated.

Thanks in advance

RE: PDMWorks Lifecycle Support & Routing Approval

If it is in the approval cycle, have it in the "In Change" lifecycle with you (or whoever is doing the change) as the owner with login password. After approval, move it to the appropriate lifecycle with someone like "document Control" as the owner (and own password).

RE: PDMWorks Lifecycle Support & Routing Approval

(OP)
I was actually looking for something a little more automated.  Sorry for not specifying that earlier.  Electronic notification, approval and mark-ups if possible.

Another concern is addressing "as-builts" or deviations. How would one track that through PDMWorks?

Thanks again.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources