×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Leachate

Leachate

Leachate

(OP)
Hai,
Iam trying to estimate leachate colllection in a cement manufacturing facility.
A leachate collection trench passes through 3 cells (one below the other) and finally gets into a contact water basin.
As per RCRA rules the collection of leachate from these 3 cells over a period of 7 days, should not exceed 30 cm. Leachate willl be collected from different areas of the facilty and goes into the contact water basin. How can i find out as how much leachate was collected from these 3 cells.
I have the contour levels for the 3 cells and contact water basin.How can i estimate the slope the slope of each cell?
iam totally ignorant of leachate colection systems.

Please suggest me a solution.
Any help would be appreciated.

Thanks,
aakanksha

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources