INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

hec-ras results

hec-ras results

hec-ras results

(OP)
Bridge replacement project.  The results for a 2 yr and 100 yr discharge are 0.1 ft apart.  450 cfs compared to 1200 cfs.  How reasonable can this be?  The water does overtop the road in a sag.  Any hec-ras users out there?

RE: hec-ras results

First off you need to examine the output from your model.  are you modeling the dip as a conveyance region?  Are you running the model in mixed regime or just sub-crit.  Also look at your error messages.  Make sure you fully examine you input data as well.  It is not easy to comment on your situation without more information.

RE: hec-ras results

depends a lot on the shape of your channel cross section

RE: hec-ras results

Overtopping would let weir flow dominate the water surface determination.  Yes, huge flow could be only 0.1 ft (that's more than an inch) above a small flow.  One tenth of a foot or weir flow over a bridge deck...I'm guessing at least 20 feet of crest width?...is a lot of capacity, at macadam's resistance.

RE: hec-ras results

could not post a thread under firebird16 so now i am rdj16.  thanks for all your helpful comments gbam, cvg, Iha.  The water surface is no longer overtopping the bridge or sag, I must have made a previous error or somthing......One recent run I made reduces the opening area from 370 ft2 to 195 ft2 using a 18 by 11 ft box.  The 100 year event rises from 385.1 to 385.2.  The state will accept it but my boss will not.  If I put a 36" or 45"  I-beam in it puts my 60' span on a carazy vertical curve which I am sure the client will not understand.  I will try a 20 or 22 by 11 box on subsequent trials.  What about setting the top of a box as the riding surface on a rural road?    

RE: hec-ras results

I worked on a design with the top of the box culvert as the driving surface (- it was overlayed with pavement section that tied into the approach roadway).  The big concern was that adjacent soils/backfill material would settle slightly, but the culvert wouldn't, leading eventually to an unintended bump in the road.  The solution was to use CDF (controlled density fill) to backfill the excavation.

Hope this helps

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources