INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Maximum sleeve size in grade beam

Maximum sleeve size in grade beam

Maximum sleeve size in grade beam

(OP)
I am building 3 story wood frame residence on auger-cast piles, grade-beams and structural slab on grade. The foot print of the house is about 40’ x 50’. There are 4 rows of 18” auger-cast piles bored to bearing soils and have cages installed to 50% of bore depth. The grade-beams are designed as 20”w x 22” h and have 8 #7 rebar in them. 4 on top, 4 on the bottom wired in a normal manner. On top of the grade-beams will be a structural slab with a thickness of 7” to 9” in thickness.  Some disagreement has arisen over plumbing and under-slab drainage. I’m looking for input/insight into how large and how many “buck-outs” (sleeves) can pass through the grade beams. The time is drawing close to pour and need to reslove this issue.

RE: Maximum sleeve size in grade beam

This is all by "feel" - but I'd keep all sleeves (I'm assuming they are horizontal and perpendicular through the beam) near the midspan of the gradebeam and centered in the vertical height of the beam.

I'd say a sleeve dia. of 10" would be appropriate.  

I would not put any sleeves near where the piling are - keep them in the middle third of the span between piling.

RE: Maximum sleeve size in grade beam

At most you should only need a 4" ground run for the house and maybe two 4" lines for footing drains. Always center them on the grade beam. I think a 5" or 6" inside diam. sleeve would be enough.

RE: Maximum sleeve size in grade beam

The uder slad sewer drains are typically 3", dryer vent is 4".  So dick's 6" appears a good number.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources