INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pretensioned spun concrete pile - wire cut-off

Pretensioned spun concrete pile - wire cut-off

Pretensioned spun concrete pile - wire cut-off

(OP)
Dear all,

In general details, pretensioned wires shall not be cut during the cut-off for Pretensioned Spun Concrete Pile. Wires shall be connected into the raft footing for connectivity between pile and concrete footing.

However, if we cut the wires the cut-off elevation, then how pile head cut-off would be rehabilitated?

Is it required to remain the pretensioned wire during pile head cut-off?

Please help me.

RE: Pretensioned spun concrete pile - wire cut-off

You should have a drawing/specification which you can follow. A common detail is to cut off the pile (including wires) at the cut-off level. Then to either fill the pile with clean sand or to suspend a formwork. Roughen the internal surface of the pile and place a rebar cage, cast concrete to the top level of the pile.

Zambo

RE: Pretensioned spun concrete pile - wire cut-off

(OP)
Thank you, Zambo!

Compared with your comments, such as "common detail", in Japn details, pretensioned wires shall not be cut-off for Pretensioned Spun Concrete Piles.

If you have any web-site on said details, please let me know.

For further help....

RE: Pretensioned spun concrete pile - wire cut-off

sorry no web-site or details on-line. I have used the detail I describe twice, once in Malaysia once in Thailand. The rebar cage and the "plug" level inside the pile were on both occasions shown on the project drawings. Doesn't the pile supplier have standard details?

Zambo

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources