INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

7 metre high King Post Retaining wall

7 metre high King Post Retaining wall

7 metre high King Post Retaining wall

(OP)
I have been asked to check a proposal for a 7 metre high retaining wall in a gravelly clay.  It is proposed to use a king post type wall with timber sleepers forming the lagging between the steel posts.  The posts are proposed to be 7m above ground with an embedment of 3m.  Without doing any calculations on the proposal, intuitively it would seem as if the embedment is too shallow and the posts would have to be very big steel sections.  The timber sleepers would appear to be overloaded also.  Overall I feel the concept is incorrect and may need revisions.  All comments welcome and suggested sources of info!!

RE: 7 metre high King Post Retaining wall

7 meters is not too high for a soldier beam and lagging wall - as long as the wall is either braced or tiedback with ground anchors. Generally, the soldier beams (your posts) are spaced at about 2.4 meters on center.  A wall 7 meters high usually has a single tier of bracing or tieback anchors unless it is supporting a large surcharge pressure. 3 meters of soldier beam embedment below grade in front of the wall is usually more than enough. The timber lagging boards (your sleepers) are usually 75 to 100 mm thick.  It is generally not a good idea to support critical structures with soldier beam and lagging walls.  They are too flexible and can allow structure settlements.  Usually, soldier beam and timber lagging walls are used for temporary walls.

RE: 7 metre high King Post Retaining wall

This is not an unusual form of construction anymore.  I agree with PEinc that I would expect to see a row of soil anchors 3-4m from FGL.  If the wall is intended to be permanent, I would also expect to see a permanent structural facing such as precast or CIP concrete.  

In order to check the structure properly you will need to have detailed knowledge of the construction sequence so you can identify the critical cases to check.  

Good luck.  

RE: 7 metre high King Post Retaining wall

Agree with the two postings above.  Using timber laggings as a facing will help to keep pore water pressures down but may not look too good with time.  You may also need to address the design life of the timber members.

The king posts could be cast into larger diameter bored holes to help increase passive resistance at the toe, but you will definitely require tie-back anchors.

If in the UK a good design source is CIRIA report SP95

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources