INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

overlay design
2

overlay design

overlay design

(OP)
If there is a pavement which has been made 10 years back but none of its design specifications and other design data are avaiable now. Traffic has increased tremendously over these years. the exisiting pavement does show some stress cracks but is still fuctioning.
So, my question is is there any standard conservative procedure to assume some original design values, calculate percent damage and then design an overlay?
I guess there are some other criteria I will have to address, please tell me what else I need to know to do that?

RE: overlay design

Find someone with a falling weight deflectometer, have them thump it, calculate the moduli, and go from there...

FWD owners tend to be universities and a few state DOT's.

------------------------------------------
      "Come to think of it, there are already a million monkeys typing on a million typewriters, and the Usenet is NOTHING like Shakespeare.

        Blair Houghton

RE: overlay design

(OP)
Thank you for your suggestion. Even when I find Mr(resilient mod.) value for the existing layer, I do not know reliability factor (which I will assume anyways) and old ESAL which I will need to find the SN.
Is it okay to just design for the new pavement starting from the basics (but keeping the base and subbase layer thickness same) and then add the asphalt layer on the old pavement to bring it upto the thinkness from new calculation.
Also, since you must have experience with this kind of work, can you tell me from experince(without any calculations)if overlay is worth it when the previous pavement was designed for light traffic whereas new pavement has to be designed for heavy-duty loads?
Totally ripping off the whole pavement and starting fresh might be agood idea economically when performance is not to be compromised???

RE: overlay design

Design the section as a new one, then go in and use what you have in place, considering the structural layer coefficient for the asphalt will be about 50 percent of its original value which was probably 0.42 to 0.44

Don't worry about old ESAL for getting SN....use new values and iterate accordingly.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources