INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Embed Palates ACI 02 (Appendix D)

Embed Palates ACI 02 (Appendix D)

Embed Palates ACI 02 (Appendix D)

(OP)
Has anyone had trouble creating feasible embed plate designs based on the new ACI-02 Appendix D?  We do alot of concrete tilt-up design and are having extreme problems making our tradiional embed plates, (joist beam supports), work with reasonable answers.

Has anyone found resonable solutions based on this new design procedure?

RE: Embed Palates ACI 02 (Appendix D)

I haven't had many problems with the ACI 02 App D procedure but that's probably due to my lack of experience; it's about all I've used except for the PCI Manual.  I agree with you though, sometimes I get some large connections but not any that have caused me problems yet.  I have heard of some other engineers having to change standard details because of the change so it sounds like you aren't alone with your problem.  

My solutions have been to use headed studs instead of hooked anchors for tension. Based on some calcs I've done it may take less than a foot of embed for the hook strength to control over concrete break out, meaning all that extra embedment doesn't help.

Some engineers use shear connectors such as welded channels instead of studs for shear capacity.

RE: Embed Palates ACI 02 (Appendix D)

You could try comparing with results from IBC procedure for anchorage to concrete.  I seem to remember that the two procedures were different.  If both give you a hard time, then I would suggest you re-evaluate either your loading or you embed sizes.  I have a table I created which covers floor beams up to 24" deep, without any problem, for shear loads only.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources