INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

vacuum ring

vacuum ring

vacuum ring

(OP)
We are having some trouble placing vacuum ring on a tower. We are using ASME Section VIII Div 1. We looked in appendix 1-8C, 1-8E and found that the max distance of the centroid of the vacuum ring from the center of the seam weld is 0.84". Since it is RT-1 radiography, we got to radiograph the seam welds. But if we put the ring at 0.84", that does not give us enough clearance to push the X ray film  (Source is inside the vessel, film outside)

We are thinking of redesigning the ring (may be I section) to keep centroid at 0.84" but the edge for welding far way from the seam weld. Has any one done this before ? Have anyone run into similar problem before?

RE: vacuum ring

altoid3000-

You are not talking about regular vacuum stiffening rings on a shell, but about the required stiffener at a cone to cylinder junction, right? It might help us with perspective if you give us more details like the diameters and thicknesses involved. To get numbers around your value, I'm guessing you're somewhere around a 60" ID with 3/8" plate.

I guess I'd have three options for you: First, do the x-raying prior to welding on the stiffening ring (or is it a PWHT vessel?). Second, as you were thinking, use a shape such as an Ell as your ring. You'll weld it on a bit farther away and still retain the centroid within your 0.84" limit. Third, and best from my perspective, is to increase the plate thickness of your cone/shell so that you don't need a stiffener (or use a cone with a knuckle).

jt

jt

RE: vacuum ring

If this is a repair to an existing vessel do you have the option of performing an ultrasonic examination of the seam weld? Ultrasonic examination is a viable method for volumetric examination. What repair code are you using API or the National Board Inspection Code? If you are using the NBIC, by all means I would substitute the UT for RT-1.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources