INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Manhole provision for the underground pipeline

Manhole provision for the underground pipeline

Manhole provision for the underground pipeline

(OP)
Dear ,all
Could anyone tell me about the criteria for applying manhole for the underground pipe? on the questions below

1. Is there any recommendation, practice or standard specified that what the pipe size should be provided manhole(s)along the pipeline for maintenance purposes? 500 mm up ?
2. How length(in meter)of interval for each manhole is suitable for installation at the pipeline in practice regardless of any obstructions during pipe erection ?

Please give me some recommendations or suggestions
Thanks indeed& Regards

RE: Manhole provision for the underground pipeline

Our state dot has the following requirements for storm drain:

Minimum Pipe Size 24" (610mm) unless it is uppermost pipe in a system then 18" (458mm) may be used.

Maximum MH Spacing:
Under 33"  --  330'
33"-39"    --  440'
42"-69"    --  660'
72" +++    -- 1200'

I didnt convert the mh data to metric but this is what we use.  Hope it helps.  Does your governing entity have any requirements like this?  Better Check if you do not know.

RE: Manhole provision for the underground pipeline

(OP)
Dear gham
Thank you so much for your suggestion, but i'm afriad that it didn't hit my exact point so i would like to give more details for more clarity.
The undergroud pipe i mentioned is water pipe (etc circulating water), not a storm drain pipe. i'm not sure if spacing you suggested can be applied for a sort of this system, please confirm and is that's a Standard, AWWA ? Anyway it may be useful for me in the future.

I've been looking forward to any suggestions.
Thanks in advance and Regards
   

RE: Manhole provision for the underground pipeline

I think you are referring to valve box to be provided in a water supply line.In a large water supply line differernt types of valves are to be placed accoding to need.For example you may need Break Pressure valves,Air valves on highest points and scour valves etc.I remember  a water supply which  was located on a height but due to mistake no Break pressure vlves were provided.Consequently pipeline bursted at six places on inauguration.so valve chambers be suitably placed as per need.

RE: Manhole provision for the underground pipeline

There is a publication titled "Recommended Standards for Water Works"  shich has been adopted by ten states in the U.S. and the Canadian province of Ontario.  It recommends shut of valve spacing at no more than 500 foot intervals in commercial areas and at not more than one block or 800 foot intervals in other areas.   (available at www.hes.org)
As mubash said, there are other valve types to be considered.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources