INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

coupled pore fluid and stress problem

coupled pore fluid and stress problem

coupled pore fluid and stress problem

(OP)
Hello,

I am modeling compaction/subsidence phenomenon with SOILS routine in ABAQUS. The geometry is an elliptical reservoir. I applied boundary conditions (prescribed displacement magnitude) and initial conditions (initial pore fluid pressures, void ratios and stresses). The first step of the analysis is an optional step to ensure an equilibrium geostatic stress field (geostatic stress to balance gravity loading). However, outputs are not correct and I obtained strains in the order of 10-4 and displacement in the order of meters. If anyone has experience with these types of problems, please let me know.

Thanks

**-------------------------------------------------------
**
** BOUNDARY CONDITIONS AND INITIAL CONDITIONS
**
**-------------------------------------------------------
*BOUNDARY
 N-SURFACE, 8,,0.
*INITIAL CONDITIONS, TYPE=STRESS, GEOSTATIC
 EL-OVERBURDEN, 0.00, 6096.00, -32228917.26, 3048.00,     .8, .8
 EL-SIDERBURDEN,-32228917.26,    3048.00, -32551206.43, 3017.52, .8,    .8
 EL-RESERVOIR, -32228917.26, 3048.00, -32551206.43, 3017.52, .8, .8
 EL-UNDERBURDEN, -32551206.43, 3017.52, -64457834.52,     0.00, .8, .8
*INITIAL CONDITIONS, TYPE=RATIO
 N-OVERBURDEN,    0.1111
 N-SIDERBURDEN,     0.1111
 N-RESERVOIR,    0.4286    
 N-UNDERBURDEN,    8.1661e-03
*INITIAL CONDITIONS, TYPE=PORE PRESSURE
 N-OVERBURDEN,         0.00,    6096.00,    29900880.00,    3048.00
 N-SIDERBURDEN,     29900880.00,    3048.00,    30199888.80,    3017.52
 N-RESERVOIR,    29900880.00,    3048.00,    30199888.80,    3017.52
 N-UNDERBURDEN,    30199888.80,    3017.52,    59801760.00,    0.00
**        
**-------------------------------------------------------
**
** Step 1: GEOSTATIC STEP TO BALANCE GRAVITY LOADING
**
**-------------------------------------------------------
*STEP
*GEOSTATIC
*DLOAD
 EL-OVERBURDEN,    GRAV, 9.81, 0, 0, -1
 EL-SIDERBURDEN,    GRAV, 9.81, 0, 0, -1
 EL-RESERVOIR,    GRAV, 9.81, 0, 0, -1
 EL-UNDERBURDEN,    GRAV, 9.81, 0, 0, -1
*BOUNDARY
 N-BASE,        3, 3
 SYMMETRY-X,   2, 2
 SYMMETRY-XYZ, 1, 1
 SYMMETRY-XYZ, 2, 2
 SYMMETRY-XYZ, 3, 3
**
** OUTPUT REQUESTS
**
*Restart, write, frequency=1
**
** FIELD OUTPUT: F-Output-1
**
*Output, field, frequency=99999
*Element Output
 E, S, VOIDR, POR
*NODE OUTPUT
 U, POR
**
** HISTORY OUTPUT: H-Output-1
**
*Output, history, variable=PRESELECT
*El Print, freq=999999
*Node Print, freq=999999
*End Step

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources