In case of shutdown of the process plant what type of safeguards shall be applied/used on subsea centrifugal pump installed at well head ?
How is the impact on the well until the pumping stops?
Thanks.
How is the impact on the well until the pumping stops?
Thanks.





RE: Shutdown in process plant vesus subsea centrifugal pumping
I assume you are shutting down the subsea pump upon a plant ESD, to stop the feed. However, there is usually a valve on the discharge of the pump that is closed, which should almost immediately provide isolation.
The pump should also have a bypass if it cannot withstand the downstream pressure.
As far as I know, there isn't any "impact" on the well until AFTER the pump stops. Then, it might be difficult or impossible to start the well flowing again.