Retaining Wall to Support Utility Pole
Retaining Wall to Support Utility Pole
(OP)
We are working on a site development project where the proposed parking lot will require a 4 foot cut into a short hillside approximately 5 feet away from an existing utility pole. We anticpate installing a retaining wall to support the cut and maintain the stability of the pole. The information we recieved from the utility company indicates the pole is embedded 9.5 feet below grade and has a moment at the ground surface of 286 kip-ft due to wind and ice loading on the pole and wires. The pole is approximately 75 feet high above the ground with 3 wires that are approximately 50 to 60 feet above the ground. The moment seems high to us and we can't get the existing condition to be stable for overturning. The overburden is a dry, residual sandy silt weathered from shale that varies from a friction angle of 34 degrees to 38 degrees based on SPT correlations. The overburden is approximately 7 feet thick and is underlain by a moderately weathered shale. My question is whether the moment seems to high based on a wind speed of 60 mph and if its not how do I calculate what loading it will impart to the retaining wall?





RE: Retaining Wall to Support Utility Pole
RE: Retaining Wall to Support Utility Pole
RE: Retaining Wall to Support Utility Pole
RE: Retaining Wall to Support Utility Pole
RE: Retaining Wall to Support Utility Pole
I disagree that replacing the pole will be cheaper than the wall. You will have lots of expenses beyond the cost of the new pole and insulators.
Use a cantilever drilled shaft wall for your retaining structure, with "braces" beneath the new pavement that bear on additional piers beneath the new pavement. The piers for the drilled shaft wall will need to be nearly tangent with one another - and heavily reinforced. You can construct the drilled shaft wall one pier at a time, minimizing the risk to the existing pole. After the drilled shaft wall is built, you can excavate to grade, then install some additional (larger) piers in front of the new wall and tie the drilled shaft wall and the "extra" piers together with stiff concrete beams that are also cast below the final pavement grade.
I've used this approach in some challenging areas - to support a 12 inch 190 psig natural gas line on the property of the Galleria Mall in Houston, for example. It can be done safely, fairly quickly - and relatively cheaply.