INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Private road
6

Private road

Private road

(OP)
What would be the maximum grade break for a private roadway serving 4 residential units?  I have an inverted crown section, so everything drains to the middle and this grade break would occur near a 90 degree turn.  Client wants me to raise grade to more closely match existing ground, but I'm afraid to put more than a 2% change in slope (going from 2% to 4%)

Thanks

RE: Private road

2
I hope this may help, I live in Tennessee and serve as a City Engineer for a small community.  Our subdivision regulations that dictates our street design is developed with assistance from the State of Tennessee Planning Division.  According to our subdivision regulations, a street to serve only 4 residential units would be classified as an access lane and the maximum grade is 12%, The regs give no algebraic difference in grade between forward or backward tangents, just a minimum vertical curve length of 150'.  However, I think in your situation that technically you would want to check corner site distance since you are so close to a  near 90 degree bend.  This requirement is a point at 3.5'from the drivers eye to the pavement to a point 150' away at 3.5'above the pavement, I would raise the grade to that point and calculate what it would be.  Regardless, if you are referring to vertical curve grade changes a 2% to a 4% is not unreasonable to do.

RE: Private road

4
I checked an AASHTO publication, Geometric Design of Very Low-Volume Roads, for vertical curve requirements.   The required length of a crest vertical curve is determined by the formula L=K*A,  where L is the length of the curve, A is the algebraic difference in the percent of slope between the intersecting grades, and K is a coefficient that is dependent on the design speed.   For a 20 mph design speed, K = 4.   If the slopes are +4% and -4%, A would equal 8, and L = 4*8 or 32 feet.  Because of the proximity to a 90% curve, this might qualify as a "higher risk" location and K(20mph) would increase to 5.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources